Subscribe

Anglo Coal FAST

Our Smith & Loveless FAST System at Anglo Coal’s Lake Lindsey mine is the latest design in the Smith & Loveless FAST range. The FAST system is built in a transportable 20ft container and treats some 20m³/day of wastewater from up to 80 people. The treated effluent is mixed with bore water and spread on the mine’s coal-haul road for dust suppression.

 

Smith & Loveless FAST System

 

Back